Instead of just exporting Timecard reports as a .csv manually can you please create a way to sync Hive to a Google Sheet and have the data auto update based on a schedule? I'm thinking of going into reports and setting the parameters of the report like I normally do but instead of there just being a download .csv button a new button would appear to sync with GSheet. After clicking that you would point Hive to the location of the GSheet and Hive would ask how often to update the gsheet. There would be a master panel in Hive to see all existing syncs and that would be the place to modify or delete existing syncs.